Koh Samui Construction Laws 2026
Koh Samui Construction Laws 2026
Koh Samui Construction Laws 2026
Compliance & Regulatory Guide
The Samui Model task force—a coalition of ISOC, Forestry Department, and local municipalities—has established systematic enforcement protocols for hillside construction. Aerial surveillance and GPS mapping technologies now monitor all development activity across the island.
Koh Samui villa construction

LUXURY VILLA INVESTIGATION UNCOVERS 93 VIOLATIONS ON KOH SAMUI

Primary Enforcement Categories
The task force prioritizes three categories of violations. Understanding these classifications is essential for any development project.
Slope & Terrain Violations
Construction on gradients exceeding 50% is strictly prohibited. Projects on 35-50% slopes require single-home restrictions with defined footprint limits. Non-compliance results in demolition orders.
Height & Zoning Violations
Properties above 80m elevation face a strict 6m height restriction including roofline. Multi-level structures in zones designated for single-story dwellings constitute primary enforcement targets.
Ownership Structure Violations
The Department of Business Development is investigating 7,000+ Samui companies suspected of utilizing illegal nominee structures. Voided ownership invalidates all associated construction permits.
Zoning Classification Reference
Reference guide for land assessment prior to acquisition. Violations result in demolition orders without negotiation. For a complete technical breakdown of height limits, setbacks, and detailed zone maps, read our engineer’s guide on Koh Samui Building Regulations.
Classification: Prohibited
Construction is not permitted within 10 meters of the shoreline. No variance applications are accepted for this zone.
Classification: Restricted
Maximum height: 6 meters. Maximum building footprint: 75 square meters. Limited to single residential structures.
Classification: Restricted
Maximum height: 6 meters inclusive of roofline. Minimum 50% of land area must remain undeveloped. Environmental impact assessment mandatory.
Classification: Restricted
Single residence only. Engineering certification required. Cut-and-fill operations limited to 2 meters maximum.
Classification: Prohibited
All construction is strictly prohibited on slopes exceeding 50% gradient. Violations are subject to immediate demolition orders.
Enforcement Priority Index
Advisory: The task force utilizes aerial photography and GPS coordinate mapping. Properties previously considered concealed are now subject to systematic monitoring and enforcement protocols.
Our Compliance Methodology
Our BIM-integrated approach works within regulatory constraints rather than against them, maximizing development potential through computational analysis.
Title Verification
Chanote title analysis and contour mapping completed prior to design commencement.
Terrain Modelling
Computational design analysis using Grasshopper/Rhino to model terrain-responsive structures.
Height Validation
Stepped-terrace designs verified at every point against the 6m regulatory envelope.
Permit Submission
Direct Tesaban submission with BIM-generated documentation. No informal procedures.
Approach Comparison
— Extensive cut-and-fill excavation to create level building platforms
— Standardized rectangular footprints without terrain consideration
— Multi-level designs frequently exceeding 6m height restrictions
— Informal permitting processes creating compliance vulnerabilities
Conventional hillside construction
+ Terrain-responsive design following natural contours with minimal excavation
+ Parametric optimization maximizing buildable area within legal envelope
+ Point-by-point roofline verification against regulatory height limits
+ Formal permit channels with accurate BIM documentation
BIM-designed compliant villa
Project Reference
Bo Phut Hillside Residence
Site Conditions: 42% gradient terrain with panoramic ocean views. Conventional box design would have exceeded the 6m height limit and required prohibited cut-and-fill operations.
Design Solution: Three-level stepped-terrace residence with each level following natural contour lines. Roofline maintained under 6m at all measurement points. Total excavation volume reduced by 70% compared to conventional methodology.
Outcome: Full construction permit secured within 11 weeks through formal Tesaban procedures. Property now operates as licensed rental accommodation without compliance concerns.
Site Feasibility Assessment
Request a preliminary site and zoning audit. We provide a detailed assessment of what can be legally constructed before any capital commitment.
Frequently Asked Questions
The Samui Model is a coordinated enforcement initiative comprising the Internal Security Operations Command (ISOC), the Royal Forest Department, and local municipal authorities. Established in late 2024, it employs aerial photography and GPS coordinate mapping to systematically identify and investigate construction violations across Koh Samui.
Foreign nationals cannot hold direct land ownership in Thailand; however, building ownership is permitted. Established legal structures include leasehold arrangements (30-year terms with renewal provisions) and properly structured Thai company ownership. The Department of Business Development is currently investigating nominee arrangements, making proper legal structure essential. We recommend engagement with qualified Thai legal counsel prior to any land transaction.
Required documentation includes: Construction Permit (Ror. 4) from the local Tesaban, Environmental Impact Assessment for hillside developments, Chanote title verification, and Forestry Department clearance for elevated sites. Our team manages the complete permitting process using BIM-generated documentation that meets all regulatory requirements.
Compliant hillside construction in Koh Samui typically ranges from 25,000 to 45,000+ THB per square meter, varying by design complexity, site accessibility, and specification level. While this may exceed conventional flat-terrain costs, it provides protection against enforcement action and preserves asset value.
Standard permits with complete documentation: 8-14 weeks. Hillside developments requiring environmental assessment: 12-20 weeks. Our BIM-generated documentation significantly reduces revision cycles and accelerates approval timelines through accurate first-submission drawings.
Crackdown: Why Luxury Villas Are Being Demolished
-
The “Ariya Residence” Demolition (Late 2024)
-
Bangkok Post (Oct 24, 2024): Samui villa demolition runs into hurdles
-
Pattaya Mail (Sept 20, 2024): Samui luxury villas on hills face demolition amidst legal violations
-
-
The “Anzhu Seamate” & Chinese Investor Crackdown
-
Khaosod English (Aug 22, 2024): Another Illegal Luxury Villa by Chinese Investors Found on Koh Samui
-
Note: This report covers the Chaweng Noi/Bo Phut crackdown on Chinese-invested villas violating slope/height rules.
-
-
The Bo Phut Hillside Demolitions (Aug 2024)
-
Bangkok Post (Aug 10, 2024): Two luxury Samui villas demolished
-
Key Detail to cite: This article explicitly mentions the failure to appeal and the subsequent demolition by the municipality.
-
-
The “Zog Villas” & Red Zone Raids (Sept 2025)
-
Khaosod English (Sept 25, 2025): Luxury Villa Investigation Uncovers 93 Violations on Koh Samui
-
The Cool Down (Oct 18, 2025): Authorities launch investigation into concerning issues at massive luxury villa project
-